The plant automatically receives prilled solid urea fed sequentially by draining 1000 kg FIBC.
The operation is automatic and continuous, as for the energy producing plants to which it is subservient. It requires the loading, by forklift, of a Big Bag of 1,000 kg at each start of the working shift (three Big Bags per day).
MARK 10 is a full cycle system full cycle system dedicated to the production of aqueous urea solution (AUS) used variously as reduction reagents, that is denitrification, for the treatment of the discharges of mobile engines type Diesel and stationary combustors (typically cogeneration groups, thermal power plants, kilns, cement works and any other with flame processes in use).
The minimum price of the plant includes the availability of demineralised water on site.